Pier Repairs & Improvements Project

The International Fishing Pier was damaged by storm surge due to Hurricane Nicole, on November 9, 2022. The City conducted a structural assessment of the pier which resulted in several recommendations for improvement.  This project is a signature attraction to the city's beachfront and will benefit the Deerfield Beach community. The International Fishing Pier attracts fishermen and sightseers from all over the world and supports the City's world-renowned live camera feed.  

This project aligns with the City's commitment to developing infrastructure, facilities, and organizational capacity for a sustainable community.

Teal swoosh line

Survey Results

Question 1 

What is your primary purpose for visiting the pier?

ANSWER CHOICESRESPONSES
Fishing29.82%                                             68
Sightseeing46.93%                                              107
Quiet Contemplation23.25%                                               53
TOTAL                                                           228


Question 2

How often do you visit the International Fishing Pier?

ANSWER CHOICESRESPONSES
This is my first visit 3.52%                                                8
1-5 times per year63.44%                                               144
I come here daily33.04%                                              75
Total                                                                                     227


Question 3

What would you like to see improve the overall experience at the pier?

ANSWER CHOICESRESPONSES
Fishing Pole Rod Holders29.41%                                      65
More fish-cleaning stations22.62%                                     50
More seating and furniture61.54%                                      136
More shade structures81.00%                                               179
More trash cans32.58%                                        72
Total Respondents: 
221


Question 4

Are you a Deerfield Beach Resident?

ANSWER CHOICESRESPONSES
Yes74.89%                                      170
No25.11%                                           57
TOTAL                                               227


Question 5

Please indicate which cartoon characters with which you most identify.

ANSWER CHOICESRESPONSES
Rocky and Bullwinkle19.50%                             39
Scooby Doo49.50%                                   99
He-Man11.50%                                      23
Beavis and Butthead15.00%                                     30
Teen Titans4.50%                                                 9
TOTAL                                 200


Teal swoosh line

Pier Options

Option 1

Complete refurbishment of the existing pier. These activities are needed to reopen the Pier in its entirety.

Option 1 aerial which shows only one gazebo in the same location it has always been

Option 1 wood railing - pier updated with new wood beams and railings

Option 1 Tee view with collapsible aluminum railing only on the T portion of the pier

Engineer’s estimate $3,600,000
  • Structural repairs
  • Restoration of spalled concrete piles
  • New wood beams
  • Restoration of wood decking
  • New wood railings with aluminum top handrail
  • New collapsible aluminum railing at T pier-end
  • Restoration of wood pavilion
  • Restoration of lighting system
  • Restoration of lightning protection
  • Services
  • New furnishings

Line-purple

Option 2

Complete refurbishment of the existing pier with additional aesthetic improvements, all-new pavilions, wood and aluminum railing

IPE wood and aluminum pavilion structure

IPE wood and aluminum railing along the pier perimeter

aluminum railing

Engineer's Estimate $1,600,000 (including professional fees)                                                                                                                                     Additional Cost over base option
  • All new IPE wood and aluminum railing along the Pier perimeter.                  ($43,000 over base option)
  • Two new IPE wood and aluminum pavilion structures.                                                ($400,000 over base option)
  • Electric supply, new indirect lighting, CCTV, and lightning protection.                ($46,000 over base option)
  • New Utilities (water, electric, security) ETC. ($140,000 over base option)

Line-purple

Option 3

Complete refurbishment of the existing pier with additional aesthetic improvements such as all-new pavilions and aluminum railing.

aluminum railing

Option 1 aerial which shows only one gazebo in the same location it has always been

lighted up pavilion

Engineer's Estimate $2,075,000 (including professional fees)                                                                                                                             Additional cost over base option
  • All new aluminum railing along the entire pier.                                                                ($870,000 over base option)
  • Two new aluminum pavilions.                        ($400,000 over base option)
  • Electric Supply, new indirect lighting, CCTV, and lightning protection.             ($460,000 over base option)
  • New Utilities (water, electric, security) ETC.($140,000 over base option)

Teal swoosh line

Pier Restoration Feedback

  1. Resident or Non-Resident*
  2. Option #1
    • Structural repairs
    • Restoration of spalled concrete piles
    • New wood beams
    • Restoration of wood decking
    • New wood railings with aluminum top handrail
    • New collapsible aluminum railing at T pier-end
    • Restoration of wood pavilion
    • Restoration of lighting system
    • Restoration of lightning protection
    • Services
    • New furnishings


  3. Option #2
    • All of Option #1
    • All new IPE wood and aluminum railing along the Pier perimeter. 
      ($430,000 over base option)
    • Two new IPE wood and aluminum pavilion structures. 
      ($400,000 over base option)
    • Electric supply, new indirect lighting, CCTV, and lightning protection. 
      ($460,000 over base option)
    • New Utilities (water, electric, security) ETC. 
      ($140,000 over base option)


  4. Option #3
    • All of Option #1
    • All new aluminum railing along the entire pier.
      ($870,000 over base option)
    • Two new aluminum pavilions
      ($400,000 over base option)
    • Electric supply, new indirect lighting, CCTV, and lightning protection.
      ($460,000 over base option)
    • New Utilities (water, electric, security) ETC. 
      ($140,000 over base option)